File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.startPage 170805 -
dc.citation.title NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT -
dc.citation.volume 1080 -
dc.contributor.author Kwak, Donghyun -
dc.contributor.author Moon, Seok-Ho -
dc.contributor.author Tshoo, Kyoungho -
dc.contributor.author Kim, Gidong -
dc.contributor.author Kwon, Jang Won -
dc.contributor.author Kim, Min Jae -
dc.contributor.author Yoo, Kyounghun -
dc.contributor.author Im, Eunhun -
dc.contributor.author Lee, Sangjin -
dc.contributor.author Kim, Hyung Jin -
dc.contributor.author Woo, Hyungjoo -
dc.contributor.author Jeong, Junyeong -
dc.contributor.author Ham, Cheolmin -
dc.contributor.author Chung, Moses -
dc.date.accessioned 2025-08-21T15:00:00Z -
dc.date.available 2025-08-21T15:00:00Z -
dc.date.created 2025-08-21 -
dc.date.issued 2025-11 -
dc.description.abstract The low-energy experimental systems at the Rare isotope Accelerator complex for ON-line experiments (RAON) consist of the Korea Broad Acceptance Recoil spectrometer and Apparatus (KoBRA) and the Nuclear Data Production System (NDPS). Controlling the beam repetition rate is essential for Time-of-Flight (TOF) experiments because too frequent primary beam bunches can cause overlapping of secondary beam bunches, leading to uncertainty in the TOF measurements of secondary beam particles. This study presents the design, fabrication, and commissioning results of a pre-bunching system at RAON to manage the beam repetition rate. The developed pre-bunching system combines a fast chopper with a Double Gap Buncher (DGB). The fast chopper utilizes the existing slow chopper electrodes by adapting them to generate pulsed beams with controlled repetition rates. Meanwhile, the DGB reduces the pulse length to less than one Radio Frequency Quadrupole (RFQ) cycle at the RFQ entrance, thereby minimizing the formation of satellite bunches during RFQ acceleration. Simulations using the SIMION code validated the pre-bunching system's performance prior to beam commissioning. Additionally, we have developed RF voltage-boosting circuits to supply high-voltage RF to both the fast chopper and the DGB. Following the design and development phase, we performed beam commissioning with Ar8+ ion beams, which successfully demonstrated the generation of single bunches for the first time at RAON, confirming the performance of the pre-bunching system. -
dc.identifier.bibliographicCitation NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, v.1080, pp.170805 -
dc.identifier.doi 10.1016/j.nima.2025.170805 -
dc.identifier.issn 0168-9002 -
dc.identifier.scopusid 2-s2.0-105010182064 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/87739 -
dc.identifier.wosid 001538406400001 -
dc.language 영어 -
dc.publisher ELSEVIER -
dc.title Development and commissioning of the pre-bunching system at RAON -
dc.type Article -
dc.description.isOpenAccess FALSE -
dc.relation.journalWebOfScienceCategory Instruments & Instrumentation; Nuclear Science & Technology; Physics, Nuclear; Physics, Particles & Fields -
dc.relation.journalResearchArea Instruments & Instrumentation; Nuclear Science & Technology; Physics -
dc.type.docType Article -
dc.description.journalRegisteredClass scie -
dc.description.journalRegisteredClass scopus -
dc.subject.keywordAuthor RAON -
dc.subject.keywordAuthor Pre-bunching system -
dc.subject.keywordAuthor Beam repetition rate -
dc.subject.keywordAuthor Double Gap Buncher (DGB) -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.