File Download

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.contributor.advisor Kweon, Sang Jin -
dc.contributor.author LEE, NA KYUNG -
dc.date.accessioned 2024-04-11T15:19:04Z -
dc.date.available 2024-04-11T15:19:04Z -
dc.date.issued 2024-02 -
dc.description.abstract This paper addresses the production scheduling problem with non-identical parallel machines in a high- mix, low-volume production environment with due dates, considering carbon emissions savings and diverse types of energy sources for machine operation. To this end, we present a bi-objective mixed- integer programming model that minimizes both the total production-related cost and the total carbon emissions in the production process to determine the optimal production strategy. For each machine, we consider various types of energy sources with different electricity generation costs and different amounts of carbon emissions. The proposed model is validated with an application to a manufacturer in Ulsan, the industrial capital of the Republic of Korea. Our results showcase the potential use of non- identical parallel machines to minimize the total cost and carbon emissions in green manufacturing. Furthermore, the results identify the trade-off between different energy sources and the total cost under different carbon emissions limits. Generally, as the carbon emissions limit increases, our proposed model tends to replace natural gas with coal to minimize the total cost. Also, we perform sensitivity analyses with respect to the energy price of different types of energy sources combined with nuclear and renewable energy sources. We find that coal provides more stability than natural gas in terms of the total cost, particularly when there are fluctuations in the price for coal and natural gas. Additionally, we determine the optimal combination of energy sources for various carbon emissions limits, aiming to minimize the total cost while simultaneously satisfying all production-related and environmental constraints.
Keywords - Production scheduling problem, carbon emissions, non-identical parallel machine, green manufacturing, bi-objective mixed-integer programming model.
-
dc.description.degree Master -
dc.description Department of Industrial Engineering -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/82038 -
dc.identifier.uri http://unist.dcollection.net/common/orgView/200000744394 -
dc.language ENG -
dc.publisher Ulsan National Institute of Science and Technology -
dc.rights.embargoReleaseDate 9999-12-31 -
dc.rights.embargoReleaseTerms 9999-12-31 -
dc.subject Production scheduling problem -
dc.subject carbon emissions -
dc.subject non-identical parallel machine -
dc.subject green manufacturing -
dc.subject bi-objective mixed-integer programming model -
dc.title The production scheduling problem employing non-identical parallel machines with due dates considering carbon emissions and multiple types of energy sources -
dc.type Thesis -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.