File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)
Related Researcher

정무영

Jung, Mooyoung
Read More

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.endPage 4791 -
dc.citation.number 20 -
dc.citation.startPage 4771 -
dc.citation.title INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH -
dc.citation.volume 45 -
dc.contributor.author Cha, Y. -
dc.contributor.author Shin, M. -
dc.contributor.author Ryu, K. -
dc.contributor.author Jung, Mooyoung -
dc.date.accessioned 2023-12-22T09:09:36Z -
dc.date.available 2023-12-22T09:09:36Z -
dc.date.created 2014-09-05 -
dc.date.issued 2007-10 -
dc.description.abstract The coordination architecture and mechanisms are proposed for the goal-balancing process (GBP), which is one of the components of goal-formation process (GFP) in the fractal manufacturing system (FrMS). Since each agent in the FrMS generates, achieves and modifies its own goal autonomously during the coordination process with other agents, it is necessary to develop a systematic methodology for the goal-formations in a manufacturing system: GFP takes charge of this methodology, which enables the formation of and the changes in goal through coordination between agents in real-time in the distributed and dynamic systems. The GFP is composed of three sub-processes: the goal-generating process (GGP), the goal-harmonizing process (GHP), and the GBP. The GGP makes and propagates goals for all fractals. The GHP then eliminates or reduces possible conflicts and interferences between goals generated in GGP. The GBP is the post-process of GHP; it refines the fractal's goal, which has been ridded of conflict during the GHP to enhance the global performance of the system, rather than maximizing the performance of each fractal. For the development of the GBP we proposed a mechanism for unit goal-balancing process (UGBP), which is the basic process of GBP that adopts the, fuzzy decision-making, and distributed problem solving approaches. -
dc.identifier.bibliographicCitation INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.20, pp.4771 - 4791 -
dc.identifier.doi 10.1080/00207540600787234 -
dc.identifier.issn 0020-7543 -
dc.identifier.scopusid 2-s2.0-34548437722 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/5870 -
dc.identifier.url http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=34548437722 -
dc.identifier.wosid 000249857900006 -
dc.language 영어 -
dc.publisher TAYLOR & FRANCIS LTD -
dc.title Goal-balancing process for goal formation in the fractal manufacturing system -
dc.type Article -
dc.description.journalRegisteredClass scopus -
dc.subject.keywordAuthor fractal manufacturing system (FrMS) -
dc.subject.keywordAuthor goal-formation process (GFP) -
dc.subject.keywordAuthor goal-balancing process (GBP) -
dc.subject.keywordAuthor agent coordination -
dc.subject.keywordPlus AUTOMATED NEGOTIATION -
dc.subject.keywordPlus ORIENTED DOMAINS -
dc.subject.keywordPlus ARCHITECTURE -
dc.subject.keywordPlus MECHANISM -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.