File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)
Related Researcher

이영주

Lee, Young-Joo
Structural Reliability and Disaster Risk Lab.
Read More

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.conferencePlace US -
dc.citation.conferencePlace Hyattsville, MD. -
dc.citation.title ICVRAM : International Conference on Vulnerability, Risk Analysis and Management -
dc.contributor.author Lee, Young Joo -
dc.contributor.author Song, J. -
dc.date.accessioned 2023-12-20T03:08:17Z -
dc.date.available 2023-12-20T03:08:17Z -
dc.date.created 2014-12-23 -
dc.date.issued 2011-41-02 -
dc.description.abstract Various structural systems are subjected to the risk of fatigue-induced failures. If such structural systems do not have an adequate level of redundancy, local failures may initiate sequential failures toward system-level failures. In order to analyze the reliability of fatigue-induced sequential failures of such structures, the Branch-and-Bound method employing system reliability Bounds method (termed as B3 method) was recently developed. Using a disjoint cut-set formulation, the B3 method identifies critical sequences of fatigue-induced failures in the decreasing order of their likelihood as it systematically updates both lower and upper bounds on the system failure probability without additional system reliability analyses. The updated bounds provide reasonable criteria for terminating the B3 analysis without missing critical sequences or estimating the system-level risk inaccurately. However, the original B3 method is not readily applicable to continuum structures because of its limitations in describing general stress distributions in limit-state formulations, evaluating stress intensity range based on the crack length, and dealing with slow convergence of the bounds for structures with high redundancy. In this paper, the B3 method is generalized to overcome these limitations, and demonstrated by a numerical example of aircraft longeron structure. -
dc.identifier.bibliographicCitation ICVRAM : International Conference on Vulnerability, Risk Analysis and Management -
dc.identifier.doi 10.1061/41170%28400%2929 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/34459 -
dc.language 영어 -
dc.publisher ASCE -
dc.title System reliability analysis of fatigue-induced sequential failure -
dc.type Conference Paper -
dc.date.conferenceDate 2011-04-11 -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.