File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)
Related Researcher

이승준

Lee, Seung Jun
Nuclear Safety Assessment and Plant HMI Evolution Lab.
Read More

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.startPage 109686 -
dc.citation.title RELIABILITY ENGINEERING & SYSTEM SAFETY -
dc.citation.volume 241 -
dc.contributor.author Jo, Wooseok -
dc.contributor.author Lee, Seung Jun -
dc.date.accessioned 2023-12-19T11:13:20Z -
dc.date.available 2023-12-19T11:13:20Z -
dc.date.created 2023-10-19 -
dc.date.issued 2024-01 -
dc.description.abstract Dynamic probabilistic safety assessment (PSA) has been introduced due to the limitations of static-based PSA such as the difficulty to analyze dynamic sequences caused by stochastic random events. While various research has been performed to achieve this integration, quantifying risk in dynamic PSA is still challenging because operator response models that can provide a branch probability according to the timing of operator action in dynamic scenarios have not yet been addressed. Existing human reliability analysis (HRA) models only consider the time given to operators for actions insofar as it can impact the failure probabilities of the human actions, despite the timing of the actions being a vital element of HRA for dynamic scenarios. This paper proposes an operator action timing-based human reliability evaluation method for dynamic PSA to evaluate the distribution of operator action timing. The method covers operator action timings with a model that convolutes two time distribution functions to provide the probability of the success or failure of an operator action. To demonstrate the practicality of the proposed method and its effectiveness, a case study and uncertainty analysis for a small break loss of coolant accident with two operator tasks were conducted. -
dc.identifier.bibliographicCitation RELIABILITY ENGINEERING & SYSTEM SAFETY, v.241, pp.109686 -
dc.identifier.doi 10.1016/j.ress.2023.109686 -
dc.identifier.issn 0951-8320 -
dc.identifier.scopusid 2-s2.0-85172331867 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/65969 -
dc.identifier.wosid 001086844000001 -
dc.language 영어 -
dc.publisher Elsevier BV -
dc.title Human reliability evaluation method covering operator action timing for dynamic probabilistic safety assessment -
dc.type Article -
dc.description.isOpenAccess FALSE -
dc.relation.journalWebOfScienceCategory Engineering, Industrial;Operations Research & Management Science -
dc.relation.journalResearchArea Engineering;Operations Research & Management Science -
dc.type.docType Article -
dc.description.journalRegisteredClass scie -
dc.description.journalRegisteredClass scopus -
dc.subject.keywordAuthor Dynamic PSA -
dc.subject.keywordAuthor Human reliability analysis -
dc.subject.keywordAuthor Operator action distribution -
dc.subject.keywordAuthor Operator action timing -
dc.subject.keywordAuthor Timing-based model -
dc.subject.keywordPlus RISK-ASSESSMENT -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.