File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)
Related Researcher

정무영

Jung, Mooyoung
Read More

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.endPage 802 -
dc.citation.number 4 -
dc.citation.startPage 789 -
dc.citation.title INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH -
dc.citation.volume 45 -
dc.contributor.author Kim, Byung-in -
dc.contributor.author Oh, Seungjin -
dc.contributor.author Shin, Jaejoon -
dc.contributor.author Jung, Mooyoung -
dc.contributor.author Chae, Junjae -
dc.contributor.author Lee, Sujeong -
dc.date.accessioned 2023-12-22T09:37:08Z -
dc.date.available 2023-12-22T09:37:08Z -
dc.date.created 2014-09-05 -
dc.date.issued 2007-02 -
dc.description.abstract Although simulation is a popular tool for modelling and analysing modern manufacturing systems, to model shop floor control systems (SFCSs) in simulation requires quite costly efforts, since they are responsible for resolving various decision problems, such as deadlock, part dispatching, and resource conflict. The objective of the paper is to address a conceptual framework necessary to generate a WITNESS simulation model automatically from graph-based process plans and resource configurations. A graph-based process plan is used to capture part operations, their related resource requirements, and their temporal precedence relationships. A WITNESS simulation model is a graphical representation of shop floor resources with the part flow logic embedded within each resource element. To generate a WITNESS model, a process plan is automatically converted into a machine-centred part routeing graph (MCPRG) and then a transport-tending part routeing graph (TTPRG). The MCPRG implies part flows among machines, in which a node represents a machine and an edge represents a part route. The TTPRG implies part flows among machines and material handling devices, in which a node represents either machine or material handler, and an edge represents a part route. From the TTPRG, the part's input and output rules for each resource can be automatically extracted and plugged into the WITNESS model. The approach proposed in the paper enables manufacturers to generate a simulation model rapidly and effectively for performance measurement, such as bottleneck identification, work in progress, throughput times, dynamic resource utilization, and deadlock, of the SFCSs. -
dc.identifier.bibliographicCitation INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.4, pp.789 - 802 -
dc.identifier.doi 10.1080/00207540600675819 -
dc.identifier.issn 0020-7543 -
dc.identifier.scopusid 2-s2.0-33847084681 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/5810 -
dc.identifier.url http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=33847084681 -
dc.identifier.wosid 000244144000002 -
dc.language 영어 -
dc.publisher TAYLOR & FRANCIS LTD -
dc.title Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system -
dc.type Article -
dc.description.journalRegisteredClass scopus -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.