File Download

There are no files associated with this item.

  • Find it @ UNIST can give you direct access to the published full text of this article. (UNISTARs only)

Views & Downloads

Detailed Information

Cited time in webofscience Cited time in scopus
Metadata Downloads

Full metadata record

DC Field Value Language
dc.citation.startPage 112455 -
dc.citation.title FUSION ENGINEERING AND DESIGN -
dc.citation.volume 169 -
dc.contributor.author Lee, Suh-Young -
dc.contributor.author Lee, Jae-Uk -
dc.contributor.author Chang, Min Ho -
dc.contributor.author Ha, Jin-Kuk -
dc.contributor.author Lee, In-Beum -
dc.contributor.author Lee, Min-Kyung -
dc.contributor.author Lee, Euy Soo -
dc.date.accessioned 2023-12-21T15:37:01Z -
dc.date.available 2023-12-21T15:37:01Z -
dc.date.created 2021-08-09 -
dc.date.issued 2021-08 -
dc.description.abstract The goal of this study was to provide a discrete-continuous scheduling model for optimal operation of the fuel cycle of ITER. The model is designed to minimize the tritium working inventory in the Isotope Separation System (ISS) of the fuel cycle by adopting a two-stage scheduling approach. To consider the effect of pump regeneration schedule on tritium fluctuation in the ISS, the suggested solving algorithm is presented as a two-stage scheduling models: Stage I obtains the optimal pump-regeneration schedule, and Stage II suggests the optimal fuel-transition timing from the ISS to the Storage and Delivery System to minimize tritium working inventory in the ISS. The scheduling model uses discrete-time representation in Stage I and continuous-time representation in Stage II. -
dc.identifier.bibliographicCitation FUSION ENGINEERING AND DESIGN, v.169, pp.112455 -
dc.identifier.doi 10.1016/j.fusengdes.2021.112455 -
dc.identifier.issn 0920-3796 -
dc.identifier.scopusid 2-s2.0-85102827684 -
dc.identifier.uri https://scholarworks.unist.ac.kr/handle/201301/53413 -
dc.identifier.url https://www.sciencedirect.com/science/article/pii/S0920379621002313?via%3Dihub -
dc.identifier.wosid 000674483400003 -
dc.language 영어 -
dc.publisher ELSEVIER SCIENCE SA -
dc.title Combined scheduling model to optimize tritium inventory in tritium plant of ITER -
dc.type Article -
dc.description.isOpenAccess FALSE -
dc.relation.journalWebOfScienceCategory Nuclear Science & Technology -
dc.relation.journalResearchArea Nuclear Science & Technology -
dc.type.docType Article -
dc.description.journalRegisteredClass scie -
dc.description.journalRegisteredClass scopus -
dc.subject.keywordAuthor ITER -
dc.subject.keywordAuthor Fuel cycle -
dc.subject.keywordAuthor Pump regeneration -
dc.subject.keywordAuthor Tritium inventory -
dc.subject.keywordPlus FUEL-CYCLE -

qrcode

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.